Operations

Gold Creek, Alberta

In 2001, MAXIM acquired the 6.5 MW Gold Creek generation facility in the Grande Prairie region of Alberta. This facility is designed to utilize waste heat from one of TransCanada PipeLines’ main line compressor to generate power.

The facility is not currently running, pending investment to connect the facility to a new compressor at the current site or another MAXIM site.